News
Vallourec Inaugurates Plant in Saudi Arabia
Issued at 2014-01-16
Tweet
Vallourec announced the inauguration of its new premium finishing plant for oil and gas tubes in Saudi Arabia, Vallourec Saudi Arabia. The facility, located in Dammam, is dedicated to heat treatment and threading for the full range of VAM® premium connections and has an annual capacity of 100,000 tons. Vallourec Saudi Arabia, a result of the 2011 acquisition of Saudi Seamless Pipes Factory Co., includes heat-treatment and finishing lines that were upgraded by Vallourec. An additional premium threading line was installed. Vallourec's total investment in the project, which is expected to create about 200 jobs, was approximately $200 million.
Source: Industrial Heating
Tweet
Related News
- Overview of China's alumina production in May 2025 and forecast for June
- METAL CHINA/DIECASTING/NONFERROUS CHINA 2025 Concluded with a Big Success
- Geologists Reveal World’s Biggest Iron Deposit Worth $6 Trillion Set to Impact Global Economy
- Integrating On-Demand Manufacturing into Modern Supply Chain Strategies
- From Art to Automation: The Evolution of Pattern-Making in Foundries
- Germany reduced steel production by 10.1% y/y in April
- How Russian steel exports have changed in the face of sanctions
- Italian Foundries: No Signs of Recovery Yet in Early 2025
- See all News