News
Vallourec Inaugurates Plant in Saudi Arabia
Issued at 2014-01-16
Tweet
Vallourec announced the inauguration of its new premium finishing plant for oil and gas tubes in Saudi Arabia, Vallourec Saudi Arabia. The facility, located in Dammam, is dedicated to heat treatment and threading for the full range of VAM® premium connections and has an annual capacity of 100,000 tons. Vallourec Saudi Arabia, a result of the 2011 acquisition of Saudi Seamless Pipes Factory Co., includes heat-treatment and finishing lines that were upgraded by Vallourec. An additional premium threading line was installed. Vallourec's total investment in the project, which is expected to create about 200 jobs, was approximately $200 million.
Source: Industrial Heating
Tweet
Related News
- American Foundry Society Announces Revised Board Succession Plan
- Metalurgia 2025 brings together launches, innovative technologies and services for the foundry chain
- Kuttner do Brasil and Kuttner No Bake Solutions bring the most advanced foundry equipment technologies to Metalurgia2025
- Metallurgy concentrates suppliers of inputs for diversified applications in the industry
- UK - Vesuvius Plc - Acquisition of the Molten Metal Systems business from Morgan Advanced Materials Plc
- Metallurgy Congress will have Technical Program focused on Process Improvement and use of AI
- Brazil launches WTO case over Trump’s tariffs
- Metallurgy brings together Innovations in Industrial Heating and Induction Systems
- See all News