News
JSW USA to Invest $500 Million in Plate Mill
Tweet
SW USA plans to invest up to $500 million to install a technologically advanced, eco-friendly hot-end facility at its 700-acre campus in Baytown, Texas. The announcement marks the second and larger phase of a plate-mill modernization and expansion project that began in June 2017. The hot end’s electric-arc furnace (EAF) is designed to generate the lowest emissions possible for steel production. According to the company, JSW USA will be the only entity of its kind (for the products it makes in North America) blending scrap with direct-reduced iron (DRI)/hot briquetted iron (HBI).
Once the hot-end project launches, JSW USA is expected to create 500 new high-wage jobs before it becomes operational 18 to 24 months later. The addition of the hot end will make JSW USA the world’s only plate mill with a contiguous large-diameter pipe mill. This will enable the company to produce its own slabs to feed the mills, instead of needing to buy foreign slabs.
This is the first equipment installation and upgrade to the facility since it was built by U.S. Steel in 1968. JSW USA is a wholly owned subsidiary of JSW Group, a $13 billion India-based company.
Source: Industrial Heating
Tweet
Related News
- Overview of China's alumina production in May 2025 and forecast for June
- METAL CHINA/DIECASTING/NONFERROUS CHINA 2025 Concluded with a Big Success
- Geologists Reveal World’s Biggest Iron Deposit Worth $6 Trillion Set to Impact Global Economy
- Integrating On-Demand Manufacturing into Modern Supply Chain Strategies
- From Art to Automation: The Evolution of Pattern-Making in Foundries
- Germany reduced steel production by 10.1% y/y in April
- How Russian steel exports have changed in the face of sanctions
- Italian Foundries: No Signs of Recovery Yet in Early 2025
- See all News